Case Study
PLANNED CAPITAL PROGRAMS

Planned Capital Improvements

target

Target

Engagement

Target has a Parking Lot initiative every year to touch several parking lots and perform needed work to bring the asset up to a 5 – 10 year extended life. EMG was assigned 13 parking lot sites late in the year in the Northeast to be completed by winter. EMG was tasked with verifying the needed scope based on the original surveys for each lot and finalizing the contract amount with the Contractors. Once the scope of work was finalized, EMG scheduled the preconstruction meeting and executed the project with full-time onsite management.

Result

EMG worked to visit each site immediately after the project was assigned, to confirm the scope of work. The goal during scope verification was to maximize the scope with the budget dollars that were authorized. Therefore, in many cases, EMG was able to reduce the scope in some areas of the parking lots and utilize those additional funds for other areas of the lot. During the preconstruction meetings, the final schedule was discussed and the goal was to complete the project in a short duration with minimal effect to the customers. EMG successfully managed the re-scoping, execution, and closeout of several parking lots for Target. EMG was able to maximize the budgets for each site to maximize the scope of work performed. EMG provided full-time onsite management, allowing direct communication to be handled with store management, as well as scope modification decisions to be made onsite as the work progressed, minimizing delays. In some cases, scope of work had to be modified during construction after the asphalt was milled off, to make sure Target was receiving their desired 5 – 10 year asset extension. EMG successfully completed all projects before winter and within budget. EMG received high marks on all project feedback forms from each store.

FOR MORE INFORMATION

For more examples of EMG’s experience with projects like yours,
visit www.EMGcorp.com and click on “Case Studies.”

EMG Client

Target

Asset Type

Retail

Services Provided

  • Permitting/Scheduling/Cost Estimating
  • Coordinating Local Inspections
  • Bid Process Management
  • Pre-bid Meetings
  • Store Equipment Orders
  • Punch Walk and Closeout
  • Change Order Review

Size & Location

Over 1,800

Timing

3 months